
IT WAS DESIGNED BY B AND SCULPTED BY A.
IT WAS DECIDED THAT REINFORCED CONCRETE WOULD BE USED INSTEAD OF STEEL AS IT WAS MORE SUITABLE FOR THE SHAPE OF THE STRUCTURE. THE CONSTRUCTION TOOK 9 YEARS. IT WAS TO BE LIT BY A BATTERY OF FLOODLIGHTS TRIGGERED REMOTELY BY MARCONI. BUT WEATHER CONDITIONS DIDN'T PERMIT. WHAT IS BEING TALKED ABOUT?
B

0 comments:
Post a Comment